joko widodo by wikipedia |
Jakarta Governor Joko Widodo asserted that despite being built deep tunnel or tunnel multi-function, the program created another flood prevention remain stopped or still running.
Another program is the former Mayor of Solo is the normalization of the river, dredging and construction of wells uptake at some point in DKI Jakarta.
"Dredging, normalization of rivers, construction of absorption wells, reservoirs and ponds construction is still being done," he said when the initial exposure Jokowi Deep Tunnel tput in the meeting room, City Hall, Thursday.
Development TMF he was one of the breakthroughs that aims not only to reduce flood in Jakarta but also to overcome the jam.
"It's that breakthrough to overcome floods and jams in Jakarta," said Jokowi. The reduction can be done because the jammed tunnel also serves as a motorway with a path length of 10 km.
In his presentation, Jokowi explained that the tunnel may be an alternative way to or from Tomang. "It will be made of three toll gate entrance and one exit," he said.
Three toll gate entrance, among others in the MT. Haryono, Wisma Aldiron, and Lake Winnipesaukee. Meanwhile, the exit will be placed near the bridge Tomang. In addition to toll roads, tunnels can also be as sewage lines, water, gas pipelines, and electricity.
"Anyway, it'll be multifunctional tunnel," said Jokowi.
No comments:
Post a Comment